DESPEC Experimental Area


Home

 

Status by the 30th of March (with the help and info from Martin Winkler)

 

Height of the beam pipe (to the optical axis): 2m

Height of the ceiling: 6 m, but could be lowered to 5.5m

 

In the moment it is considered to have few slewing cranes at the setup positions (in this case the catilever, however, must be rather long) or maybe straight cranes under the roof of the cave (however, in this case some positions can not be reached)

 

Layout 1

 

Layout 2

 

ACAD drawing

 

Mail comments and suggestions